Duration Control System for Construction Project Using PERT

Show simple item record

dc.contributor.author Myint, Khine Pa Pa
dc.contributor.author Tun, Khin Mo Mo
dc.date.accessioned 2019-07-12T03:30:57Z
dc.date.available 2019-07-12T03:30:57Z
dc.date.issued 2010-12-16
dc.identifier.uri http://onlineresource.ucsy.edu.mm/handle/123456789/797
dc.description.abstract The Program Evaluation and Review Technique (PERT) has been widely used as a tool for project management. In PERT analysis, the activity time distribution is assumed to be a beta distribution, and the mean and variance of the activity time are estimated. These support the critical path and the probability of the whole project. With the information of mean and variance of critical path, which is assumed as normally distributed, the probability of completion of a project with specified dates can compute. To establish a PERT Cost, one first develops a framework for gathering cost data for each activity. Using the Optimum Time- Cost Estimate Concept of Resource Allocation Supplement method of Cost Estimation, one can find the minimum cost for specific completion dates. The system in this paper gives the expected duration, critical path, probability and time-cost estimates of the whole project using the application of Bridge Construction. en_US
dc.language.iso en en_US
dc.publisher Fifth Local Conference on Parallel and Soft Computing en_US
dc.title Duration Control System for Construction Project Using PERT en_US
dc.type Article en_US